Optimization of Production Process Activities in an Effort to Increase the Production Capacity of BZ 020 Cover Housing

Authors

  • Muhammad Syahrul Akmal Universitas Negeri Yogyakarta
  • Orlanda Arya Hidayat Universitas Negeri Yogyakarta
  • Moch Solikin Universitas Negeri Yogyakarta

DOI:

https://doi.org/10.21831/jamat.v2i2.2464

Keywords:

8 Steps Improvement, Production Capacity, Optimization, Cycle Time

Abstract

The objectives of this study are: (1) To optimize the production process activities of Cover Housing BZ 020 production by implementing an 8-step improvement to increase production capacity. (2) To determine the comparison of the production capacity value of Cover Housing BZ 020 before and after the improvement. (3) To determine the activities that can be optimized to increase the production capacity of Cover Housing BZ 020 production. The method used in this research is the 8-step improvement research method approach. The data collection techniques used are (1) Observation and (2) Documentation. Meanwhile, the research instruments used are (1) Logbook, (2) Observation Sheet, and (3) Cellphone. The data analysis used is descriptive, comparing production capacity and operator activities. The results of this study indicate that: (1) Implementation of the 8-step improvement can be done at PT. Gemala Kempa Daya and is in accordance with the applicable standard SOP. (2) The results obtained after the improvement of production capacity are from 360 units/hour to 468 units/hour, or an increase of 30%. As a result of this improvement, the company also recorded a profit of IDR 55,800,000.00 per year. (3) By adding an extension conveyor, it can shorten the duration of two of the four operator work activities. The decrease in cycle time from 10 seconds to 8 seconds is due to optimizing work activities.

Downloads

Download data is not yet available.

References

[1] T. Tafakur, A. S. Dewi, and M. Solikin, "Pelatihan Online Karyawan Industri Otomotif: Kesiapan Diri Berdasarkan Perspektif Calon Peserta," Jurnal Pendidikan Vokasi Otomotif, vol. 5, no. 2, pp. 87-100, 2023.

[2] D. S. Iriani and S. Soeharto, "Evaluasi pelaksanaan praktik kerja industri siswa kompetensi keahlian jasa boga SMK N 3 Purworejo," Jurnal Pendidikan Teknologi dan Kejuruan, vol. 22, no. 3, pp. 274-290, 2015.

[3] N. A. Y. Pambayun, S. Sukoco, W. Suyanto, and S. Sudarwanto, "Konsep Modifikasi Untuk Meningkatkan Daya Mesin Sepeda Motor," Jurnal Pendidikan Vokasi Otomotif, vol. 1, no. 1, pp. 38-53, 2018.

[4] S. Prakoso and Y. A. Putra, "Pengendalian kualitas twisted cable dengan metode seven tools dan quality control circle (QCC) di PT Voksel Electric Tbk," Jupiter, vol. 1, no. 20, pp. 89-108, 2020.

[5] G. M. R. Sulaeman and I. N. Gusniar, "Analisis Pengendalian Kualitas Menggunakan Metode Quality Control Circle pada Part JK6000 di PT. XYZ," Jurnal Serambi Engineering, vol. 8, no. 2, pp. 5029-5036, 2023.

[6] Z. Arifin, M. Martubi, K. Haryana, M. Solikin, and I. Siswanto, "Penyelarasan Kurikulum Jurusan Pendidikan Teknik Otomotif FT UNYBerbasis Kerangka Kualifikasi Nasional Indonesia," Jurnal Pendidikan Teknologi dan Kejuruan UNY, vol. 22, no. 1, pp. 119-126, 2014.

[7] M. Prasetyawati and D. Y. Kurniawan, "Analisis Peningkatan Produktivitas Panel Engine Hood Outer Berkaitan Dengan Modifikasi Dies Pada Mesin 5a-line Di PT. Adm," JISI: Jurnal Integrasi Sistem Industri, vol. 1, no. 1, 2014.

[8] C. V. Gunawan and H. Tannady, "Analisis kinerja proses dan identifikasi cacat dominan pada pembuatan bag dengan metode statistical proses control (studi kasus: pabrik alat kesehatan PT. XYZ, Serang, Banten)," Jurnal Teknik Industri, vol. 11, no. 1, pp. 9-14, 2016.

[9] J. F. Yonatan and H. C. Palit, "Upaya Peningkatan Kualitas Dengan Metode PDCA Di PT Astra Komponen Indonesia," Jurnal Titra, vol. 3, no. 2, pp. 283-288, 2015.

[10] U. Rochayati and M. Zakaria, "Peningkatan Kualitas Pembelajaran Teknik Digital melalui Pembelajaran Berbasis Lesson Study," Jurnal Pendidikan Teknologi Dan Kejuruan UNY, vol. 19, no. 1, pp. 21-44, 2010.

[11] A. Y. Nasution and S. Yulianto, "Implementasi Metode quality control circle untuk peningkatan kapasitas produksi propeller shaft di PT XYZ," SINTEK JURNAL: Jurnal Ilmiah Teknik Mesin, vol. 12, no. 1, pp. 33-39, 2018.

[12] I. Purnamasari, D. Adhimursandi, and M. Nadir, "Optimalisasi manufacturing cycle effectivieness (mce) terhadap pengelolaan value added activities dan non value added activities dalam meningkatkan efisiensi produksi," Jurnal Manajemen, vol. 10, no. 1, pp. 29-37, 2018.

Downloads

Published

12/31/2025

How to Cite

[1]
Muhammad Syahrul Akmal, Orlanda Arya Hidayat, and Moch Solikin, “Optimization of Production Process Activities in an Effort to Increase the Production Capacity of BZ 020 Cover Housing”, JAMAT, vol. 2, no. 2, pp. 179–188, Dec. 2025.

Issue

Section

Articles

Similar Articles

1 2 > >> 

You may also start an advanced similarity search for this article.