Analysis of supplier selection criteria using fuzzy analytical hierarchy process by contractors in Yogyakarta

Lidya Iriani Thabita Tiblola, Universitas Gadjah Mada, Indonesia
Akhmad Aminullah, Universitas Gadjah Mada, Indonesia
Arief Setiawan Budi Nugroho, Universitas Gadjah Mada, Indonesia

Abstract


One of the factors that can support the success of a project to be completed on time and within budget is the selection of the right supplier because the selection of the right supplier can ensure the availability of materials to maintain the production trajectory. Supplier selection is a multi-criteria problem where each criterion has a different importance and needs to be precisely known. It must combine other criteria consistent with company goals to achieve maximum supply chain performance. Therefore, it is necessary to evaluate the supplier performance criteria needed by each company. The purpose of this research is to prioritize factors that contractors can use in selecting suppliers so that construction entrepreneurs can determine which suppliers can perform from the best criteria. One supplier selection method is the Analytic Hierarchy Process (AHP) method. However, this method still has a problem in the form of subjective assessment results, thus requiring a method that can overcome these problems, namely the Fuzzy Analytic Hierarchy Process method. Based on the literature study results, this research identifies 18 factors that influence the selection of material suppliers, which are grouped into six categories: Delivery, quality, price, service, performance, and management. Data collection in this study used questionnaires distributed to 10 respondents and processed using the Fuzzy AHP method. Based on the data processing that has been done, it is obtained that the criteria that prioritize local contractors in Yogyakarta in selecting suppliers are quality criteria with a value of 0,380, followed by cost criteria with a value of 0,283, and delivery criteria with a value of 0,157.


Keywords


Fuzzy AHP, Supplier selection, Supplier material

References


M. Safa, A. Shahi, C. T. Haas, and K. W. Hipel, “Supplier selection process in an integrated construction materials management model,” Autom Constr, vol. 48, pp. 64–73, 2014, doi: 10.1016/j.autcon.2014.08.008.

A. Abdullah, A. Rauzana, S. Kuala, and B. Aceh, “Faktor sisa material yang mempengaruhi biaya pada pelaksanaan proyek konstruksi gedung di Provinsi Aceh,” Jurnal Arsip Rekayasa Sipil dan Perencanaa, vol. 1, no. 4, pp. 148–155, 2018, doi: 10.24815/jarsp.vlil.12465.

C. Limantoro, A. Andi, and J. Rahardjo, “Analisa faktor cost overruns dengan metode Interpretive Modelling pada beberapa proyek konstruksi di Indonesia,” Dimensi Utama Teknik Sipil, vol. 10, no. 1, pp. 20–37, Apr. 2023, doi: 10.9744/duts.10.1.20-37.

N. C. Fitriana and B. Santosa, “Analisis faktor-faktor pemilihan supplier material pada jasa usaha konstruksi dengan metode Fuzzy AHP,” Jurnal Fondasi, vol. 9, 2020.

D. R. Beil, “Supplier selection,” in Wiley Encyclopedia of Operations Research and Management Science, Wiley, 2011, pp. 16–24. doi: 10.1002/9780470400531.eorms0852.

B. B. Ulum, “Penerapan sistem pendukung keputusan untuk evaluasi performa supplier semen menggunakan metode Fuzzy Analytical Hierarchy Process (Studi kasus PT. XYZ, Purwosari),” Universitas Yudharta, 2020.

Sugiyono, Metode penelitian kuantitatif kualitatif dan R&D. Bandung: Alfabeta, 2011.

P. Pitchipoo, P. Venkumar, and S. Rajakarunakaran, “Fuzzy hybrid decision model for supplier evaluation and selection. International Journal of Production Research,” Int J Prod Res, vol. 51:13, no. 3903–3919, 2013.

P. Kaur, “Selection of vendor based on Intuitionistic fuzzy analytical hierarchy process,” Advances in Operations Research, vol. 2014, Dec. 2014, doi: 10.1155/2014/987690.

L. Merry, M. Ginting, and B. Marpaung, “Pemilihan supplier buah dengan pendekatan metode Analytical Hierarchy Process (AHP) dan TOPSIS: Studi kasus pada perusahaan retail,” 2014.

Ž. Stević, I. Tanackov, M. Vasiljević, B. Novarlić, and G. Stojić, “An integrated fuzzy AHP and TOPSIS model for supplier evaluation,” Serbian Journal of Management, vol. 11, no. 1, pp. 15–27, 2016, doi: 10.5937/sjm11-10452.

S. K. Patil and R. Kant, “A Fuzzy AHP-TOPSIS framework for ranking the solutions of knowledge management adoption in supply chain to overcome its barriers,” Expert Syst Appl, vol. 41, no. 2, pp. 679–693, 2014, doi: 10.1016/j.eswa.2013.07.093.

C. F. Laksono, C. Gunawan, and P. Nugraha, “Analisa karakteristik pemilihan supplier beton ready-mix, bekisting, dan tulangan baja oleh perusahaan kontraktor dan owner di Surabaya berdasarkan tingkat kepentingan kriteria,” 2018.

Y. A. Messah, S. Utomo, and S. F. Tefu, “Kajian kriteria dalam sistem pemilihan pemasok material oleh perusahaan kontraktor di kota Kupang menggunakan metode Analytical Hierarchy Process (AHP),” Jurnal Teknik Sipil, vol. V, no. 1, 2016.

T. L. Saaty, “Fundamentals of decision making and priority theory with the Analytic Hierarchy Process,” vol. IV, 1994.

Kusrini, Konsep dan aplikasi sistem pendukung keputusan. Yogyakarta: CV. Andi Offset., 2007.

I. Afifah, “Sistem pendukung keputusan rekomendasi kenaikan jabatan dosen Uin Maulana Malik Ibrahim Malang dengan metode Fuzzy AHP,” 2018.

M. Frödell, “Criteria for achieving efficient contractor‐supplier relations,” vol. 18, no. 4, pp. 381–393, 2011.

W. Y. Wu, B. M. Sukoco, C. Y. Li, and S. H. Chen, “An integrated multi-objective decision-making process for supplier selection with bundling problem,” Expert Syst Appl, vol. 36, no. 2 PART 1, pp. 2327–2337, 2009, doi: 10.1016/j.eswa.2007.12.022.

A. Kokangul and Z. Susuz, “Integrated analytical hierarch process and mathematical programming to supplier selection problem with quantity discount,” Appl Math Model, vol. 33, no. 3, pp. 1417–1429, Mar. 2009, doi: 10.1016/j.apm.2008.01.021.

A.E. Cengiz, O. Aytekin, I. Ozdemir, H. Kusan, and A. Cabuk, “A multi-criteria decision model for construction material supplier selection,” Procedia Eng, vol. 196, pp. 294–301, 2017.




DOI: https://doi.org/10.21831/jptk.v30i1.68323

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 Lidya Iriani Thabita Tiblola

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.

 

Online (e-ISSN): 2477-2410 || Printed (p-ISSN): 0854-4735

Jurnal Pendidikan Teknologi Kejuruan by http://journal.uny.ac.id/index.php/jptk was distributed under a Creative Commons Attribution 4.0 International License.

View My Stats

Supported by:

Jurnal Ilmiah Magister Managemen

Social Media: