Pratiwi, Anik Nurul, Wisnu Rachmad Prihadi, and Muhammad Donny Reval Al-Pashya. “Cost and Time Performance Evaluation of a Sports Hall Construction Project Using the Earned Value Method: A Case Study at Gunung Kidul Campus, Universitas Negeri Yogyakarta”. Inersia : Jurnal Teknik Sipil dan Arsitektur 21, no. 1 (June 10, 2025): 91–101. Accessed June 19, 2025. https://journal.uny.ac.id/index.php/inersia/article/view/84089.