[1]
A. N. Pratiwi, W. R. Prihadi, and M. D. R. Al-Pashya, “Cost and Time Performance Evaluation of a Sports Hall Construction Project Using the Earned Value Method: A Case Study at Gunung Kidul Campus, Universitas Negeri Yogyakarta”, inersia, vol. 21, no. 1, pp. 91–101, Jun. 2025.