[1]
Pratiwi, A.N. et al. 2025. Cost and Time Performance Evaluation of a Sports Hall Construction Project Using the Earned Value Method: A Case Study at Gunung Kidul Campus, Universitas Negeri Yogyakarta. Inersia : Jurnal Teknik Sipil dan Arsitektur. 21, 1 (Jun. 2025), 91–101. DOI:https://doi.org/10.21831/inersia.v21i1.84089.