EVALUASI PELAKSANAAN PROYEK BANGUNAN PEMERINTAHDITINJAU DARI SEGI WAKTU PELAKSANAAN DI KABUPATENSLEMAN DIY TAHUN 2011
Abstract
The aim research are (1) Delay in the implementation of the project; (2) Thebank capital; (3) materials of project; (4) relationship betwen Owner, projectconsultant, and contractor. This research was conducted in Sleman Daerah IstimewaYogyakarta. The sampleof this research is 15 person, with random sampling. Thedata of Analysis using Descriptive of quantitative and percentage. The result aredelay in the implementation of the project, the bank capital were 38.5% and 53.3%respectively. The relationship betwen Owner, project consultant, and contractor werethe result 43,8%. Thats means the relationship is unfavourable.Keyword: project, relationship
Full Text:
PDFDOI: https://doi.org/10.21831/inersia.v8i1.3697
Refbacks
- There are currently no refbacks.
Copyright (c) 2022 Bada Haryadi, Imam Muchoyar
This work is licensed under a Creative Commons Attribution 4.0 International License.
Publisher: Co-Publisher:
Indexed by:
INERSIA by https://journal.uny.ac.id/index.php/inersia/index was distributed under a Creative Commons Attribution 4.0 International License.