ABSTRACT
Multi-storey building construction in order to increase operation and production needed working equipment, by which one of them was tower crane. Besides improving construction process, tower crane also could give negative impact. Failure of lifting object, broken equipment, breaking of sling strap, broken lifted material, and damage on construction structure around the site, as well as injury or even worst, death, were series of risks that might happen in lifting work process by using tower crane. Therefore, research done on construction of Teaching Industry Learning Center (TILC) building in UGM Vocational School was aimed to identify the risk of work accident in using tower crane, in order to prevent accident. The method used in this research to determaine the risk value of each risk indicator using the Analitycal Hierarchy Process (AHP). Based on the results of calculation using the Analitycal Hierarchy Process (AHP), indicator with the highest risk value is tower crane operation with a risk value of 0,1832, the second order is installation tower crane with a risk value of 0,1209, the third order is tower crane dismantling with a risk value of 0,0358. From each indicator, it is known that the most influential sub-indicator is based on the order of the risk value. Furthermore, efforts are made to control the risk of each sub-indicator.
Keyword: Analitycal Hierarchy Process (AHP), Risk, Tower crane
ABSTRAK
Pembangunan gedung bertingkat agar dapat meningkatkan pelaksanaan dan produksi membutuhkan peralatan kerja, salah satunya adalah tower crane. Selain meningkatkan pelaksanaan dalam pembangunan, tower crane juga dapat memberikan dampak negatif. Gagalnya penangkatan beban, rusaknya alat peralatan, putusnya tali sling pengikat, rusaknya material yang diangkat, dan kerusakan pada struktur bangunan di sekitarnya serta cidera atau bahkan terjadinya kematian adalah bagian dari rangkaian risiko yang mungkin saja terjadi di saat proses pekerjaan pengangkatan menggunakan tower crane. Oleh karana itu penelitian yang dilakukan pada proyek pembangunan Gedung Teaching Industry Learning Center (TILC) Sekolah Vokasi UGM ini bertujuan untuk mengidentifikasi risiko kecelakaan kerja dalam penggunaan tower crane, guna mencegah terjadinya kecelakaan. Metode yang digunakan dalam penelitian ini untuk mengetahui nilai risiko dari setiap indikator risiko yaitu menggunakan Analitycal Hierarchy Process (AHP). Berdasarkan hasil dari perhitungan menggunakan Analitycal Hierarchy Process (AHP), indikator dengan nilai risiko tertinggi yaitu pengoperasian tower crane dengan nilai risiko 0,1832, urutan kedua pemasangan tower crane dengan nilai risiko 0,1209, urutan ketiga pembongkaran tower crane dengan nilai risiko 0,0358. Dari masing-masing indikator diketahui subindikator yang paling berpengaruh berdasarkan urutan nilai risiko tertinggi. Selanjutnya dilakukan upaya pengendalian risiko dari setiap subindikator.
Kata kunci: Analitycal Hierarchy Process (AHP), Risiko, Tower crane
References
S. Mulyani, Analisa Risiko Kecelakaan kerja Dengan Menggunakan Metode Domino Pada Pembangunan Proyek Apartemen Grand Taman Melati Margonda-Depok. Institut Teknologi Sepuluh Nopember, 2016.
G. Pradana, Penentuan Risiko Proyek Kontruksi Swakelola Dengan Integrasi Treshold Risk Dan Ahp (Analitycal Hirarchy Process) Studi Kasus: Pembangunan Fakultas Agama Islam Universitas Islam Indonesia. Universitas Teknologi Yogyakarta, 2019.
M. Nazir, Metode Penelitian. Bogor: Ghalia Indonesia, 2013.
L. . Moleong, Metode Penelitian Kualitatif. Bandun: Remaja Rosdakarya, 2006.
A. F. Falatehan, Analitycal Hierarchy Process (AHP) Teknik Pengambilan Keputusan Untuk Pembangunan Daerah. D.I. Yogyakarta: Indomedia Pustaka, 2016.
G. Flanagan, R Norman, Risk Management and Construction. London: Blacwell Science, 1993.
Downloads
Published
How to Cite
Issue
Section
License
Authors who publish with INERSIA journal agree to the following terms:
- Authors retain copyright and grant the INERSIA journal right of first publication with the work simultaneously licensed under Creative Commons Attribution License (CC BY 4.0) that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal.
- Authors can enter into separate, additional contractual arrangements for the non-exclusive distribution of the published version of the work (e.g., post it to an institutional repository or edit it in a book), with an acknowledgment of its initial publication in this journal.
- Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) before and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.

INERSIA by https://journal.uny.ac.id/index.php/inersia was distributed under a Creative Commons Attribution 4.0 International License